Busy, Busy, Busy!
Since returning from both the northwest overland rally and the BC overland rally, progress on the truck was paused until my shipment of Total Composites panels arrived. thats not to say that i remained idle by any means... building and installing a few slide out bed platforms for sprinter vans, beginning to pack up the shop, backpacking around Mt. St. Helens and getting a few other projects in. While planning for our shipment to arrive, we were able to find a shipping terminal just minutes away from the shipping port in seattle. This allowed us to transload the panels into our extra large cargo trailer. With a few helping hands we were able to maneuver two full sets of panels into the trailer, in just an hour and a half we were loaded and secured to make the drive back down to portland where we unloaded one set of panels at their destination and headed for home. after three busy days of making preparations, organizing a crew and planning the assembly; it was time to assemble the habitation box. with the help of friends and family, we worked for two and a half days dry fitting and then glueing together the habitation box. despite the 100+ degrees, fiberglass dust, sticky adhesive, and a few moments of panic, the last piece finally went on. while allowing the adhesive to dry, we wasted no time in beginning the installation of the Outbound windows and hatches. we are very excited to be at this stage of the build and intend on mounting to the chassis this weekend once i have a chance to run a few wiring circuits and finish cleaning and sealing the box.