A couple updates:
- Steering box is mounted in place, high and low pressure lines are hooked up to the pump, steering shaft connected to steering wheel and pitman arm in its final place.
- Track bar bracket built, additional gusseting still to come.
- 40 gal fuel tank arrived from our fabrication shop. It will mount further back on the chassis to make room for the transfer case and provide 15 more gallons of fuel. This will most likely be a part we sell to people wanting more range on their 2wd vans. We kept tank depth the same as stock for use of the factory sending unit.