I built the whole upper frame of my first production trailer, set up the water heater framing, the elctrical system framing, the counter top and sink and stove area. Changed it from the original as the water heater and elecrical will now be behind a wall from the kitchen. Added drop in rails to the original frame so the side panels will drop into 3/4 inch angle iron with PL 4000 to seal the chance of water ever getting into the lower side, put on the fenders, fit the plywood floor pieces, still need to pick up a sheet of plywood 3.4 tongue and grove in the morning. Have finished all welding that I can, as I ran out of 1x2 steel for the roll cage setup. Hope to have all the welding done by Tuesday nite and off to the Rhino man on Wednesday morning. Ordered, or at least emailed the order to Eclipse, for delivery next Friday.
Do not have the talent to put pictures up so actually nothing happened and I lied, not really but no pictures no workie.