Quadrotrac

Slowly gathering all the parts for the new wiring:

21828181fi.jpg


Will finish my last exam on saturday then i`ll have some time to work on this thing again.
 
Today was an awesome day. First i passed the last exam, so i`m a service engineer now. Then i got a call that everything should work out with my new shop.

But i got something done too. First i mounted the side facing working lights:

21852730ab.jpg


Also the rear strobes:

21852738ac.jpg


The horn:

21852751ki.jpg


And the compressor for it:

21852757rz.jpg


Then i turned some M19x1 inside threads:

21852772mz.jpg


So i can screw in this push button switch:

21852777zu.jpg


Turned some grooves:

21852780ig.jpg


Flipped it around and did the same thing again, just put different grooves in:

21852784gb.jpg


Cut it off and drilled a hole for the wires:

21852789ri.jpg


First one is the steering lever with horn switch:

21852801vu.jpg


Second one the wiper lever with washer switch:

21852808yc.jpg
 
Finished the safety lock for the steering lever:

21864735la.jpg


Then i cut the old instrument cluster:

21864764vx.jpg


Thats what i`m going to use:

21864774pr.jpg


Soldered some wiring in:

21864793qq.jpg


Tested it:

21864799pw.jpg


Then i started cutting the new dash:

21864803nk.jpg
 
Congratulations on passing the exam!
Dude, that thing is going to look like the sun at night!

Sent from my Passport using Tap
 
This is coming along man, looks great. I love the handles...

Congrats on your final exam and your new certification, feels good to complete something like that. I remember finishing my Red Seal Journeyman Program years ago, felt like a big accomplishment.
 
It`s not sure yet if everything works out. But if, it`d be great. It`s about 600m², got a 3ton crane in it and like 150ton worth of machinery. Some really big ones like a vertical lathe, a 200t press, just everything really big.

Mounted two 12V outlets and the wiper switch today:

21939076ma.jpg


Couldn`f find a dome light that i`d like, so i thought i`ll build my own. Squared up a scrap piece of aluminium:

21939077df.jpg


Milled some features in it:

21939095uo.jpg


Drilled some holes and put a few threads in:

21939102re.jpg


Finished except of the clear cover:

21939104ng.jpg
 
Good work on the rig Steinez, as usual. Can you post any pics of the new shop? 600 square meters of room. WoW:Wow1: You must be thing of going into production!:)
 
Removed the seat today:

22147043zx.jpg


Then i brought out my hydraulic hole punch:

22147045bk.jpg


And put in some grommets for the shifter cables :

22147046tb.jpg


Then i made the air intake for the heater:

22147047ts.jpg


22147049uo.jpg


22147053ae.jpg


Need to relocate the hot/cold lever so i started building a linkage:

22147054ga.jpg


22147057wr.jpg


22147062oe.jpg


22147063gt.jpg
 
Milled down the backside of the mount:

22152901np.jpg


Used my new scribe for the first time, it`s really awesome:

22152909hh.jpg


Milled a rectangle in:

22152920sg.jpg


Tacked it in:

22152923hl.jpg


And made a linkage for it:

22152926sa.jpg


Also bend up another tube...

22152938ev.jpg


22152942gd.jpg
 

Forum statistics

Threads
190,879
Messages
2,932,834
Members
234,708
Latest member
empireoverlandza
Top