Any CAD guru worth his salt should be able to draw that out and produce a materials list, cut sheet, hardware list, etc., within a few weeks, not 1-2 years. Any metal fabricator worth his salt should then be able to take said drawings, cut sheets, etc and build it.
I understand their...