More progress
One of the things I forgot to mention in the previous post. The VHB I am using is .040 thick, on purpose, as it makes the Koropop bond much stronger.
I have a test piece all glued up, exactly as I installed my 8020, and the pull scale arrives Tuesday. More to follow on that. 10 inches of 8020 glued to a roof 14 inch roof plug. I will pull away until something fails. I just want to know......just because.
Shower pan- cut and installed. GREAT quality and easy to cut. We found one the correct width but 4 inches longer than we needed. Cut, install 1/4 aluminum bar tapped for 1/4-20 SS hardware for the toilet and seal up the end before we move on to the bathroom wall panels.
Interior 8020 glue in almost complete, upper cabinets frames to finish.
The wonderful wife tackled exterior box mock up and planning. THANK YOU @CAMPERTHING for the design and lead on the side cargo boxes! We will use your design for the two side boxes and will contact Highway Products this week to get the custom grey tank box(she found a perfect HDPE tank to fit), and stair side recovery gear box, design process rolling and discuss time lines.
The Do all came in HANDY!
VERY WELL supported! This thing is a beast!
II I cut the drain hole after this test fit. THAT is where it lives!
Notice the cardboard "box". More CAD!
ONWARD.....here comes rear bumper, plumbing and heater installation.
CHEERS!!
One of the things I forgot to mention in the previous post. The VHB I am using is .040 thick, on purpose, as it makes the Koropop bond much stronger.
I have a test piece all glued up, exactly as I installed my 8020, and the pull scale arrives Tuesday. More to follow on that. 10 inches of 8020 glued to a roof 14 inch roof plug. I will pull away until something fails. I just want to know......just because.
Shower pan- cut and installed. GREAT quality and easy to cut. We found one the correct width but 4 inches longer than we needed. Cut, install 1/4 aluminum bar tapped for 1/4-20 SS hardware for the toilet and seal up the end before we move on to the bathroom wall panels.
Interior 8020 glue in almost complete, upper cabinets frames to finish.
The wonderful wife tackled exterior box mock up and planning. THANK YOU @CAMPERTHING for the design and lead on the side cargo boxes! We will use your design for the two side boxes and will contact Highway Products this week to get the custom grey tank box(she found a perfect HDPE tank to fit), and stair side recovery gear box, design process rolling and discuss time lines.
The Do all came in HANDY!
VERY WELL supported! This thing is a beast!
II I cut the drain hole after this test fit. THAT is where it lives!
Notice the cardboard "box". More CAD!
ONWARD.....here comes rear bumper, plumbing and heater installation.
CHEERS!!