Finally starting my m416 trailer build

Thinking about how to mount the solar panel for the nose box batteries to the roof rack on top of the tent
IMG_3043.jpeg
 
Have now ordered the Timbren suspension. Think it will arrive in about 3 weeks. Then that gets installed and we’ll do wheel adapters so the wheels and rims match those on my Land Rover Lightweight. Once that is done we’ll paint the trailer to match the Rover. Hoping it’s finally done in maybe 6 weeks or so. We’ll see.
 
I think it’s finally finished. Took quite a few years, but very happy with it. I’m sure there will be a few more tweaks along the way…

imagejpeg_0.jpeg

imagejpeg_0.jpeg
 

Forum statistics

Threads
190,918
Messages
2,930,233
Members
234,789
Latest member
Fj89
Top