What we did on mine was to tack the smaller, upper tubing in place on the lower, larger tubing in the interior-most corner. Then, we tacked the upper cross pieces in place and added the upper rack and then ground off the tacks attaching the upper and lower tubes. This minimized the amount of slack between the upper and lower tubes.
Hope this helps
Hope this helps

