What it looks like inside
Been a while since I've had time to post. We've already done a 1500 mile trip in the "She Beast" up the Eastern Sierras to the Black Rock Desert, and back down through Death Valley.
Now we know some of the "next" things that need doing . . . before our winter trip :smiley_drive: That made me think I should catch you all up :sombrero:
This is the kitchen counter getting test fitted
Next the support framing, cooler storage, and shelves.
Our copper plumbing.
Shelves loaded and ready for travel.
