That it does Ian. The first trip and it'll be covered in dust and scratches!
Progress today... Wifetec helped me get the AC back off and refit the freshly painted top section of the fold out steps, then it was back under with the truck. I had calculated the height required for the truck to clear the temporary frames... This necessitated the front wheels being on blocks for the spare wheel mast top to go under the first temporary frame. However, I'd forgotton about the step up in the side skirts at the gas locker! 40mm too high!! Some quick thinking had a ratchet strap around the front left shock absorber, and the front left tyre down to 30 psi! The locker slid under the temporary frame with mm to spare!
It was then on to some interesting jacking and blocking to allow the removal of the temporary frame and lowering of the body! Here it is with approx 150mm left to go. I have a few things to do before it sits on its mounts.
Next up is the final fit of the Air Con lower unit, connection of the grey tank, water fill and water inlet, plug in the two transfer sockets (24v from truck to living and supply to water pump 1 (and a few spare twin core supplies from the body)). I'll also hang the rubber infill strips on the body now as the accessis easier, before lowering the body into position next weekend.