slimtwo
Adventurer
Alright! I have been waiting for this day for a while, and it got here yesterday. The box has been transferred to the trailer. I finished the battery connections, and installed the weather-stripping on top of the frame (vibration insulation between box and frame). Next, I placed 1 ½” x ¼”PVC strips on the insulation, on top of the long running frame rails, and with the help of my friend and my son, we taped them in place, and prepared to transfer the box on to the trailer. We removed the wheel on the left side of the trailer, as that is the side, we were loading the box from, and proceeded to slide the box in place.
It went well for the most part, however, I shouldn’t have made the tolerances quite so tight. But it did go on. I just have a little more paint touch up than I would have liked. Once the box was in place, we removed the PVC strips, and reinstalled the wheel.
That, my friends, is a milestone. Now, I can get the lights installed, and wired up, and make an appointment at the DMV, to get it registered.
And now for the doors.
For all of you who are following, thank you! Stay tuned. I’m not there yet, more to come.
Happy Trails!
It went well for the most part, however, I shouldn’t have made the tolerances quite so tight. But it did go on. I just have a little more paint touch up than I would have liked. Once the box was in place, we removed the PVC strips, and reinstalled the wheel.
That, my friends, is a milestone. Now, I can get the lights installed, and wired up, and make an appointment at the DMV, to get it registered.
And now for the doors.
For all of you who are following, thank you! Stay tuned. I’m not there yet, more to come.
Happy Trails!