Some pictures. Looking at them makes me feel like I've got very little done in the week+ off work.
A big problem I've encountered is the patch I mentioned in post #196. The Sikaflex didn't "wet" to the polypropylene tank and it came away. Lucky I spotted this before locking the tanks in forever. I now need to find an alternative. The tank maker is suggesting gorilla glue from Wurth plus lots of self tap screws. I'll try to source tomorrow.
I got the floor cut out at test positioned to get a sense of where I need to position stuff and drill holes etc.
View towards the cab
View to the rear. The raised floor only extends to within 750mm of the rear wall. That space at the end will have bunks in it for the short term but will be convertible to take a motorbike.
This is the under floor Dometic Aircon/Heat Exchanger being positioned for the floor cut outs.
I also fitted another hatch. This one went in a lot easier due to the size. This will give access to the plumbing etc.
We had torrential rain while I was away and there is definitely a roof leak plus the larger hatch is not sealing completely. I'll need to do some "adjusting" on one of the hinges. The roof leak will need the box guys to come out and sort.
I also got started on the plumbing:
This weekend has been artic cold (for Ireland) which made working with the plastic piping a real PIA. Normally its reasonably flexible, but today it was like a steel spring returning to the coil shape it was shipped in.