luthj
Engineer In Residence
As soon as I get a rough date on the subframe steel, I will put an order in for all the front end parts. Bearings, brakes, bushings, etc. Should go together fairly quick once everything arrives. Assuming I haven't screwed up somewhere, which is always a possibility. The fuel tank needs finalized, as does the trans support. Still thinking about the Tcase shifter. Not sure what direction I want to go.


