These pictures are about a week old but better late than never!
The windows are here and installed. I'm pretty excited with how they turned out. My north star windows didn't open very well so I'm excited to have some I can pop open easily.
Interior view of the bigger window. This is where my dinette will be.
These two windows are on the kitchen side. The propane and the wheel wells come through the floor a little bit but are hidden by the cabinets.
Dual propane tanks. These are mounted mostly under the floor with a couple inches coming up through the floor under the fridge. I think I might add a gage to check how full they are a little easier.
There's not much to show on the interior yet. Everything was taken apart when I was visiting so they could run wire and water lines and stuff.
This picture shows the future shower/bathroom which will be in the grey box. This is counter top height so when it's not in use it'll be extra counter space. The plan is for the counter top to open up and have some curtains on a track.
The water tank for the shower is here under one of the dinette sinks. There's a separate water tank under the kitchen for drinking. I have some interesting plans for water reuse in the shower so it was pretty important for me to have two separate tanks, but the details are still being worked out. At the moment the plan is for a 5 stage filter system which ends with an ultrafilter, but I'm a little worried it might be too slow. I have a feeling my shower system will evolve over time.
This is an older picture that pre-dates the windows, but I don't have any good ones from this side of the camper yet. There has been an extra hole in the cabinet cut out for the suburban heater since this was taken. Next to the sink in the gap there's going to be a water tank and above that is the oven/range.
pass through portal into the truck
These pictures are about a week old. I heard recently that the truck and camper are going in for paint soon.