Taking time to work through a problem and identify multiple solutions offers choices, and having options is generally beneficial. This approach guided my design of the Blue Sea Systems DC Accessory Panel, where I valued the space for four accessories: one 12V dash socket, two Dual USB chargers, and one Mini Voltmeter. While I prioritized the Mini Voltmeter and one Dual USB charger, the 12V dash socket and second USB charger seemed less essential for my off-grid camper, as they duplicated existing outlets. After further research, I purchased a Blue Sea Systems Mini OLED Tank Meter and a Temperature Meter to enhance system monitoring, ensuring a precise and efficient layout.

RC 25-169.jpg

Inspired by an aircraft cockpit, I designed my camper’s gauges, switches, and controls to prioritize efficiency and intuition. I applied this cockpit-inspired logic to the secondary row gauges - system voltage, auxiliary diesel tank percent full, and outside air temperature - based on their importance, frequency of use, and logical grouping. Arranging them left-to-right in this order optimizes a top-to-bottom, left-to-right scan, ensuring a balanced, intuitive interface for my off-grid system.
  • DC Voltmeter
    • offers quick health check for batteries and charging
    • highest priority among secondary gauges
    • a direct indication of electrical system stability during heavy loads
  • Tank Meter
    • indication of auxiliary diesel tank level which provides fuel for Wallas Nordic DT heater and cook top
    • critical for planning duration of heating and cooking
    • moderate priority as fuel monitoring is important, but less urgent than power system
  • Temperature Meter
    • provides environmental data regarding outside air temperature
    • lowest priority and less critical for immediate operations unless outside conditions are extreme
    • this will assist in making battery heating decisions
RC 25-170.jpg

I created a layout drawing for two Noctua 120mm fans, to be placed on each side of the Zarges K470 case, ensuring optimal cooling for my camper’s electronics. Though this drawing took only moments to create - and may seem minor to others - I carefully plan every modification. Planning 120mm holes for a $900+ case justified the effort, as one mistake could compromise the project. This precision ensures the fans integrate seamlessly with my layout.
RC 25-171.jpg

I positioned a 120mm hole saw on the Zarges K470 case’s side to cut holes for two Noctua fans, but the horizontal raised ribs - designed for structural rigidity - raised concerns. I had to cut through these ribs, so I considered cutting speed, down-force, lubrication, and the risk of the teeth catching a rib, potentially wrenching the drill from my hand. A drill press with a clamped case would have eased these concerns, but I planned a controlled hand-drilling process instead.
RC 25-172.jpg

Another concern was drill breakthrough - a common issue most have experienced. It occurs when drilling thin, unsupported sheet metal, pulling the bit into the workpiece as it breaks through. To avoid this, I drilled a pilot hole, progressed to using the hole saw’s pilot bit, and then remounted the hole saw, keeping RPMs low, applying light pressure, and pausing to cool the Tungsten Carbide teeth and workpiece. This careful process ensured clean cuts through the Zarges K470’s raised ribs, supporting my precise fan placement.
RC 25-173.jpg

Cutting the 120mm hole freehand was challenging, using a 30-year-old Craftsman drill and a $25 hole saw, especially with the Zarges K470’s raised ribs. Despite these non-ideal tools, it worked. All holes were deburred and cleaned with a hand file, ensuring a professional finish.
RC 25-174.jpg

I test fit the Noctua fan and grille on each side of the Zarges K470 case, confirming secure mounting and clean alignment, and both fit well and looked professional. While a complete shop would streamline the process, this unique project is nearly complete, soon freeing me to plan and enjoy off-grid adventures for years to come.
RC 25-175.jpg

I'm going to ask you to take a moment to consider how meticulous design and layout helps to align you with spiritual truths:
  • God is the Creator ex nihilo, the ultimate source of all order, beauty, and precision in the universe
  • Catholic tradition, as articulated by St. John Paul II in Laborem Exercens, views human work as a participation in God’s creative and redemptive mission
  • St. Thomas Aquinas, a cornerstone of traditional Catholic theology, argues that beauty arises from integritas (wholeness), consonantia (proportion), and claritas (clarity)
From a traditional Catholic perspective, precise layout reflect spiritual truths of truth, discipline, order, and beauty. These mirror the divine attributes celebrated in the Latin High Mass, where every detail glorifies God.
  • Scribing the Workpiece: Like inscribing the soul with grace through the sacraments, marking a workpiece sets the foundation for its purpose.
  • Measuring with Precision: Analogous to examining one’s conscience or adhering to moral truth, ensuring measurements align with the blueprint reflects fidelity to God’s law.
  • Cutting to Perfection: The act of cutting to its final form parallels the soul’s sanctification, refined through grace and effort to reflect divine perfection.
Lord, have mercy...

RC 25-176.jpg
 
Last edited:

ramblinChet

Well-known member
Before installing the Victron Energy components inside the Zarges K470 case, I needed to complete one major cutout on the lid for the Wallas Nordic DT diesel heater/cooktop. My primary concern was to scribe a precise rectangle to avoid cutting an irregular parallelogram into the lid, which I had already invested significant time and effort into.

Aluminum is easy to work with, so I marked the corners, measured diagonals between non-adjacent corners to confirm 90° angles, scribed lines between corners, and applied masking tape around the perimeter. Since I was performing a manual layout and cutting freehand, I left extra material outside the scribed lines to allow for manual cleanup to the final dimensions.
RC 25-177.jpg

I used an angle grinder with a cutting wheel for the cutout. Although this method is basic, success is achievable with careful layout, slow cutting, and conservative cuts inside the final dimensions. Spending thirty minutes filing to achieve the final dimensions is preferable to removing too much material during the initial cut.

Given my focus on human factors and user-machine interaction, I carefully considered every aspect of the system’s design. Initially, I planned to position the Wallas unit several inches to the right, but after spending a few days in the camper with the Zarges K470 case temporarily in place, I realized the case’s edge served as a comfortable armrest. Consequently, I shifted the cutout several inches to the left to preserve space for my forearm when seated. Such details require time to identify, and overlooking this minor benefit would have been unfortunate.
RC 25-178.jpg

The Wallas unit fit precisely with minimal movement in any direction. The unit is shown with the lid raised, functioning as a cooktop, with the primary burner on the left and a secondary burner on the right used for simmering.
RC 25-179.jpg

The unit is shown with the lid lowered, operating as a heater. A fan beneath the unit draws air from the rear, passes it over the heated surface, and exhausts it through the front. With a variable output of 3,000 to 6,400 BTU/h, the heater ensures the camper remains comfortable in extreme weather conditions.
RC 25-180.jpg

The image shows the underside of the Wallas unit with the lid open. Routing the power wires and fuel line should pose no challenges. However, I have explored multiple exhaust configurations and have not yet finalized a solution due to ongoing component rearrangements. Ideally, the 28 mm stainless steel exhaust hose, encased in a 30 mm fiberglass insulator, would remain connected when opening and closing the lid. This seems unlikely, though. Fortunately, the lid will only be opened every three to six months for inspection and maintenance.
RC 25-181.jpg

Another challenging aspect of this project was the installation site for the Zarges K470 case, which has two distinct heights and depths. The upper-left image shows the hard surface on the left, which is 3/4 inch higher than the carpeted surface on the right. Additionally, the hard surface is deeper than required, while the carpeted section is too shallow. These differences caused the K470 case to sit unevenly and overhang, prompting me to address the issue while reinforcing the case’s internal suspended floor.

The upper-right image shows the test fitting of the aluminum C-channel aligned with the component mounts. A chance encounter with a friend, a fabricator at Hampton Sheet Metal, led to a quick design sketch on a napkin, and I collected the fabricated parts the next morning. The lower-left image shows the C-channel installed, and the lower-right image shows the components securely bolted in place.
RC 25-182.jpg

This image provides a clearer view of the aluminum C-channel functioning as cantilever beams. These beams serve two primary purposes: (1) they transfer the 24-pound weight of the three internal components directly to the underlying surface, and (2) they support the section of the case extending beyond the carpeted shelf. In a static environment, the case alone could likely support the load, but this installation, located just behind the rear axle, must withstand the dynamic forces of rough, bumpy trails.
RC 25-183.jpg

All Victron Energy components feature Bluetooth connectivity and communicate via the VE.Direct network, except for the inverter. Approximately one month ago, I purchased a Bluetooth Smart Dongle to enable the inverter to connect with other components and allow performance monitoring.

The smallest available socket head cap screw I had available, an 8-32 x 3/4, was a tight fit in the mounting slot. Using a small round precision file, I enlarged the slot to allow the screw to pass through easily.
RC 25-184.jpg

The main image shows the Bluetooth Smart Dongle mounted inside the case, connected to the inverter in the lower left. An inset image displays the 8-32 screw heads and washers on the case’s exterior. This week, I will focus on mounting the remaining Victron Energy components, finalizing the wire and pass-through layout, and starting the wiring process.

At this point in the project, the thrill is gone. Endless revisions? As men we must lean forward and soldier through the chaos.
RC 25-185.jpg
 
Last edited:

ramblinChet

Well-known member
This is a question from another forum that you may find helpful:

@ramblinChet I'm considering a regular cab build for camper and had a few questions. How are you using the storage space behind the seats? Anything particular you like to store there? Early on I know you said you kept your recovery bag on the passenger footwell, I wouldn't have that option since my wife will be traveling with me.
Is there a noticeable difference in maneuverability from your friend with the Power Wagon and camper because of the wheelbase and overall length? How about the difference in the stability between the 2 setups? I know that the PW doesn't have much payload capacity and a lot of people complain about the coil spring setup when it comes to campers.

Thanks for the questions, @ajn507! Payload is the critical factor in a camper build - far more important than cab type, wheelbase, or other specs. I’ve never heard anyone at a campfire wish they’d chosen a Power Wagon or a regular cab for lockers or wheelbase. The real struggle is always payload. Many try airbags or stiffer springs, but issues persist. My solution? A 3500 single-rear-wheel with a Hemi.

Start with a payload spreadsheet: list your camper’s weight (say, 1,500 lbs average), passengers, fridge contents, water, fuel, recovery gear, tools, clothes, and essentials. Total it up—let’s say 1,000 lbs for gear and people, so 2,500 lbs base payload. Add a 15% safety margin for future additions (2,500 × 1.15 = 2,875 lbs). Crucially, aim to use only 50-75% of your truck’s payload capacity to avoid overtaxing systems not designed for continuous max loads. For 2,875 lbs, your truck needs 3,833–5,750 lbs capacity (2,875 ÷ 0.75 or 0.50). A Power Wagon’s 1,600-lb payload falls short. My 3500 had 4,590 lbs before the AEV Prospector upgrade, though larger tires and lift reduce this slightly. I’ve met plenty of 2500 owners with campers who regret not going 3500, but never the reverse.

This is the storage behind my regular cab’s front seat:

RC 25-186.jpg

For storage behind my regular cab’s front seat, I keep (left to right, top to bottom):
RC 25-187.jpg

On wheelbase and maneuverability, these are minor concerns for overlanding compared to payload. As for stability, leaf springs (standard on 3500s) outperform coils (on 2500s) due to higher payload capacity and wider spacing, which improves leverage against camper weight. Your setup - regular cab, 2500, or 3500 - depends on travel frequency and destinations. What are you considering?
 
Last edited:

ramblinChet

Well-known member
The next component installed was the Victron Energy Blue Smart IP22 Charger 12/30 (1), intended for occasional use at campgrounds or locations with shore power. The inset picture highlights a design flaw: the 120-volt AC cable is centered directly over the mounting foot, just 0.5 inches above it. This positioning complicates installation in tight spaces, as it restricts the types of fasteners and tools that can be used.
RC 25-188.jpg

While securing the SmartSolar MPPT 100/30 Charge Controller with 18-8 stainless steel bolts and nylon lock nuts, I encountered galling and cold welding, requiring me to cut off one fastener and replace it. Galling, a type of adhesive wear, occurs when similar metal surfaces, such as 18-8 stainless steel, slide under pressure, leading to material transfer, surface damage, or seizing. Cold welding, a related phenomenon, involves atomic-level bonding of clean metal surfaces under high pressure without heat, exacerbating galling.
RC 25-189.jpg

A top-down view shows all primary components installed. In the upper-right corner is a Phoenix 500-watt inverter. Below, center and right, are two Lynx Power In units equipped with MEGA fuses. The lower-left houses the IP22 Charger, while the upper-left features an Orion XS DC-DC charger, with the SmartSolar MPPT 100/30 Charge Controller just to its right. This layout differs from my latest drawing to provide a resting spot for my arm while seated, shifting the Wallas cooktop and heater 3-4 inches and necessitating internal reconfiguration.

To evaluate usability, I’ve kept the Zarges K470 box inside my camper for weeks without permanent installation. This allowed me to test interactions, such as sitting on the driver’s side or climbing into bed when extended. Given the time spent in the camper, addressing these minor details early prevents significant issues.
RC 25-190.jpg

King bricks served as perfect spacers, positioning the K470 case 3.5 inches from the camper’s interior walls for three reasons: (1) to keep the lid open when lifted, (2) to ensure ventilation for the nearby fan, and (3) to enhance aesthetics by adding depth.
RC 25-191.jpg

This picture shows the lid open with the Wallas Nordic DT temporarily installed, illustrating the increasingly confined space.To my knowledge, no one has previously integrated an entire electrical suite with a diesel cooktop and heater in a Zarges K470 case. Calculations suggest feasibility, but real-world testing across various climates will determine success or failure.
RC 25-192.jpg

Reconfiguring the interior layout provided additional space for the solar charger and flexibility for a potential upgrade to a larger unit. While not anticipated, this option is valuable.
RC 25-193.jpg

A side view with the lid closed reveals my concern about placing a diesel cooktop and heater above electrical components in the same case. Calculations support this setup, but a heat shield may be added if necessary. Wiring, fuel, and exhaust lines remain to be completed.
RC 25-194.jpg

Wire congestion on the left side of the case led me to relocate some wiring to the unused right side, adding complexity. Initially, all electrical lines were to drop directly into the battery compartment on the left. Now, positive and negative lines drop on the right, where the case overhangs, into a narrow compartment beside the battery compartment. Pilot holes were drilled for Blue Sea Systems Feed Through Connections to facilitate this, with the inset picture showing precise alignment with camper holes despite tight spacing.
RC 25-195.jpg

A nearly completed section shows the feed-through connectors on the bottom left, with the negative line running via Ancor 4 AWG wire to the Lynx Power In. On the positive side, a Victron Energy Smart BatteryProtect 12-volt 100-amp isolates the Blue Sea Systems ST Blade Fuse Block, enabling shutdown of connected devices (lights, fan, refrigerator, USB chargers) via a switch or Bluetooth. This preserves house batteries during extended parking by eliminating parasitic loads. An inset picture shows me crimping an Ancor 3/8" 4 AWG lug onto Ancor 4 AWG wire, emphasizing the value of proper tools.
RC 25-196.jpg

The 120-volt AC input, feeding shore power to the IP22 charger, connects to a storm-proof NOCO AC plug previously installed on the camper’s rear. The main picture shows the AC line running from the right-side plug to the left-side charger, secured by vibration-damping rubber loop clamps. Inset pictures depict the pre-installation area and the external input. My commitment to precise component alignment and tidy wiring reflects a professional approach, where attention to detail ensures quality. In my opinion, that's the way you do it...
RC 25-197.jpg
 
Last edited:

ramblinChet

Well-known member
The last photo in my previous post showed a 120-volt AC input feeding shore power to the IP22 charger, so I wanted to capture my expenses associated with that input, along with two other feed-through studs I ordered.
RC 25-198.jpg

One of the many small details I appreciate about Victron Energy components is the push-in terminal blocks. It’s great to securely mount the component, pull out the small terminal block to connect 16 AWG wires securely, and then push the terminal block back into place. This often makes an otherwise difficult job in a congested space much easier. Perhaps they could consider offering the same for larger wires someday?

The inset pictures show push-in terminal blocks used on the Phoenix Inverter and Smart BatteryProtect. I’m using the 100-amp BatteryProtect in an unusual but valuable way: if I flip a remote toggle switch to the ON position, the BatteryProtect shuts down and stops exporting power to the 100-amp fuse block that powers lights, fans, refrigerators, etc. This allows me to eliminate all parasitic power for long-term storage with a single switch.
RC 25-199.jpg

At this point in my project, time is more critical than money, so if I need a few parts, I don’t hesitate to order them. I’m using more 10-32 3/4" socket head screws than anticipated, but fortunately, the nuts and washers were sold in packs of 50 and 100, respectively, so I have enough remaining. The need for a single-pole-double-throw (SPDT) toggle switch arose from a mistake I made with the Smart BatteryProtect’s operation. I misread the Victron Energy manual and tried using a SPST toggle switch, which didn’t work as intended. This order fixed my error, and now I have a spare SPST toggle.
RC 25-200.jpg

Toggle switches (3) and (4) are installed and operational. Following my aircraft cockpit layout design, these switches are grouped because they manage power to components. Toggle switch (3) activates the Phoenix Inverter when I plan to use it, which will be occasional. The inverter has a zero-load power consumption of 6 watts and can be set to ECO mode, consuming 1 watt while “waking up” every 2.5 seconds to check for a load. Neither is significant, but power consumption across multiple components adds up quickly. Toggle switch (4) deactivates the Smart BatteryProtect for long-term storage when flipped to the ON position. In the normal OFF position, it allows the BatteryProtect to export power to the fuse block mentioned earlier.

The top inset picture shows both switches in their normal position. Before leaving a campsite and hitting the trail, I aim to visually check that all switches are down in their normal position. If one is left on by accident, the safety cover will protrude and alert me. The covers also protect the switches from being bumped into an undesired position as I move around the camper. The bottom inset picture shows the backside of toggles (3) and (4), along with Ancor 16 AWG wire and nylon fully insulated disconnects.
RC 25-201.jpg

In my last post, I mentioned occasional galling and cold-welding issues with 18-8 stainless steel nuts and bolts during installation. Earlier this week, a close friend who worked with me at NASA LaRC suggested filling the initial threads on the bolt with grease to prevent this issue. In my shop, I had a tube of AeroShell 33 synthetic lithium grease, so I reviewed its specifications and decided it would work well. This grease has a wide temperature range, but its key feature for me was its benefit for sliding applications requiring molybdenum disulfide. Lubricating just the tip is sufficient when dealing with tight tolerances or forced insertion.
RC 25-202.jpg

One of the first components to receive power was the Blue Smart IP22 Charger, and it felt great to connect it to the Lynx Power In bus bars, upgraded with MEGA fuses. I’m keeping the area between the charger and bus bar as open as possible since it will soon become congested. The inset picture shows a Fluke ST120 GFCI Socket Tester confirming the circuit is correct. These inexpensive testers are essential, as they instantly indicate issues like an open ground or reversed hot and neutral wires.
RC 25-203.jpg

I’m not a fan of Amazon and never considered subscribing to Amazon Prime, but a few months ago, I realized I’d be ordering many small, inexpensive items for this project and needed them delivered within a day or two. I plan to cancel my membership once the project is complete, but the subscription has been helpful, as I’m not concerned about shipping costs or delivery times. In this case, I needed an odd-sized Ancor lug to connect 6 AWG wire to a #10 screw. I placed the order, and hours later, the part was delivered to my home.
RC 25-204.jpg

The next component connected was the SmartSolar MPPT 100/30 Solar Charge Controller. An MPPT (Maximum Power Point Tracking) solar charge controller optimizes power output from solar panels by dynamically adjusting voltage and current to match the battery’s charging needs. This unit is installed between the solar panels and the battery (bus bar).

The lower-left inset picture illustrates my luck, as I didn’t calculate the screwdriver’s length to ensure just enough room between components for it to fit. A properly engineered system would include such details, but since this is a one-off creation and I expected tight spaces, I left a reasonable amount of room, saving time on additional calculations and fitting. This is for the chassis ground, and the other inset picture shows the 6 AWG wire installed with a #10 screw. I could have used a slightly smaller 8 AWG wire, but some locations may require the chassis ground to match the largest wire in the system, so I chose to avoid potential issues and set a good example.
RC 25-205.jpg

In closing, here is a picture of the Lynx Power In #2, upgraded with MEGA fuses and now fully occupied.

From left to right:
  • SmartSolar Charge Controller
    • 6 AWG positive and negative
    • 6 AWG chassis ground
  • Phoenix 12/500 Inverter
    • 4 AWG chassis ground
    • 6 AWG positive and negative
  • Smart BatteryProtect 100-amp
    • 4 AWG positive and negative
This project seems to be never-ending and, and a lot's of work to be done.
RC 25-206.jpg
 

Kingsize24

Well-known member
I'm using that same Victron shore charger and it's great! And, I was using that same MPPT charger. If you will be anywhere really hot, a fan helped me tremendously, or it derated quickly, (Texas Heat... lol) There was a guy on Etsy that I bought my fan mount from for $15 at the time, and looks like there are still some making them, but it made a HUGE difference. Not sure if it would be needed in your case, but just wanted you to know. It solved our issue completely.

il_fullxfull.5015768204_rcxi.jpgil_340x270.5949355486_p8fh.jpgil_fullxfull.6237468603_mzwf.jpg
 

ramblinChet

Well-known member
I'm using that same Victron shore charger and it's great! And, I was using that same MPPT charger. If you will be anywhere really hot, a fan helped me tremendously, or it derated quickly, (Texas Heat... lol) There was a guy on Etsy that I bought my fan mount from for $15 at the time, and looks like there are still some making them, but it made a HUGE difference. Not sure if it would be needed in your case, but just wanted you to know. It solved our issue completely.

View attachment 879732View attachment 879733View attachment 879734

Thank you for the information and pictures @Kingsize24. With regards to heating the charge controller is my primary source of concern and that is reason I had it mounted on the back of the case with plenty of room around it. The additional room, and push/pull fans on the sides of the case "should" provide adequate ventilation even on the hottest days in Texas, Arizona, etc. but this is an experiment after all.

As you have suggested, mounting an additional fan directly behind the unit is the best option and if necessary, I will do just that. The PWM controller for my fans can handle a total of three fans and I since I am only running two currently, I have the circuity in place already. An upgrade would be as simple as mounting the fan and plugging into the existing circuit.

Another option would be Victron Energy releasing an upgraded line of charge controllers that are more efficient and handle heat better. It would be great for them to have an output on the unit capable of directly controlling and providing power to a PWM fan along with an optional mechanical mount for a fan.
 

ramblinChet

Well-known member
The final major component installed in the revised electrical system is the Victron Energy Orion XS 12/12-50 DC-DC Charger. This unit draws 50 amps from the engine alternators while driving to charge the 200 Ah house batteries in my camper. Theoretically, if the batteries are nearly depleted, driving for about four hours could fully charge them. As with all components in this project, I’ve used the largest wire possible, in this case 4 AWG, to minimize voltage loss.

When specifying this truck, I anticipated installing a DC-DC charger, which led me to opt for dual alternators rated at 380 amps for $295 - a great value, in my opinion.
RC 25-207.jpg

I recently ordered some tools and supplies for this project, and I highly recommend investing in specialized tools. The Ancor Premium Battery Cable Stripper is a great tool, eliminating the struggle of carefully cutting insulation without damaging the wire’s fine strands.

While Ancor Cable Tie Mounts and Thomas & Betts Cable Ties cost more than some alternatives, I’ve never understood why builders pair premium components with cheap wires, lugs, or ties. Budget options are fine if they work for you, but I’ve been living in this camper for years and plan to continue. My priority is securing components and wires to prevent loosening and potential fire hazards. Quality is worth the extra cost - for me and for you.

Early in the project, I tried listing the wire lugs I’d need, but the task was overwhelming. Instead, I purchased an Ancor 100-piece Tinned Copper Lug Kit and a 47-piece Adhesive Lined Heat Shrink Tubing Kit. These kits offer flexibility in selecting the right lug for each application, and I can easily reorder when supplies run low.

RC 25-208.jpg

The Victron Connect app on my phone provides real-time monitoring of all components, which is incredibly convenient. Initially, I noticed slight voltage variations in the app, while my Fluke 77V MAX showed consistent readings at the wire terminals. After consulting the Victron Energy Community Knowledge Base, I learned that activating the BMV-712 Smart Battery Monitor will enable VE.Smart Networking, allowing components to share a common battery voltage and temperature reference.
RC 25-209.jpg

Next, I ran positive and negative 1/0 AWG wires to the battery, air compressor, and chassis ground, connecting the Lynx Power In to Blue Sea Systems 3/8" Feed Through Connectors. I’ve been quiet lately because this section was challenging - space was tight, and I still have three Feed Through Connectors to install. I meticulously planned the box size, component layout, heat generation, and cooling needs but underestimated the space required for the wires. The Vibration-Damping Loop Clamps and Cable Tie Mounts consumed more room than expected.
RC 25-210.jpg

Space was so limited that I flipped the box to map the layout on the backside after drilling a pilot hole. Precision was critical - an 1/8" misalignment could jeopardize the project. I prefer a larger safety margin, but this was cutting it close.
RC 25-211.jpg

Thankfully, everything turned out better than expected! Photos may suggest ample space, but the wide-angle lens distorts reality. The gap between Feed Through Connectors is a precise 0.075", perfectly uniform. The outer connectors appear misaligned due to lens distortion and proximity.

One inset photo shows me drilling 24mm holes, hoping for success - once metal is removed, there’s no going back. Another shows 38mm holes below, allowing wires to pass into the battery compartment.
RC 25-212.jpg

Five 1/0 AWG wires are laid out for reference, with Feed Through Connectors and zip ties loosely placed for test fitting. Once permanently installed, they’ll be secured tightly, helping me gauge space for additional wiring.
RC 25-213.jpg

Here is a picture of the Lynx Power In #1, upgraded with MEGA fuses and now fully occupied.

From left to right:
  • Blue Smart IP22 Charger
    • 6 AWG positive
    • 6 AWG negative
  • Main to 200 Ah battery bank
    • 1/0 AWG positive
    • 1/0 AWG negative
  • Chassis ground to vehicle frame
    • 1/0 AWG negative
  • ExtremeAire Magnum air compressor
    • 1/0 AWG positive
    • 1/0 AWG negative
  • Orion XS 12/12-50 DC-DC Charger
    • 4 AWG positive
    • 4 AWG negative

RC 25-214.jpg

I’ve begun using recently ordered parts, including Reinforced Untreated Bumpers to support the box’s perimeter where it doesn’t contact the surface below. Neoprene is ideal for equipment exposed to sunlight, rain, and ozone, and is commonly used in industrial vehicles and heavy machinery. I chose these bumpers for their high hardness (Durometer 80A) and temperature range (-40 to 200°F).
RC 25-215.jpg

An inset photo shows me test-fitting three bumpers. The aluminum C-channel needed slight relief because the ledge’s 90° steel edge trim contrasted with the softer outdoor carpet, causing a minor imbalance. The reliefs resolved this, and all is well.

Progress continues daily, but on nights like this, I sometimes pause and wonder: where do we go now?
RC 25-216.jpg
 

ramblinChet

Well-known member
Excellent work as always. I really need to get to work rewiring my system (lol) and add/ upgrade components. Just got to figure a place to put it all

Thank you for your kind words @Mekcanix and here's wishing you the very best!

This project has taken much longer than I had planned, but I am learning a lot, taking my time to do my best, and pursuing my initial desire to create something unique. As I have discovered, packing electronics into a confined space is increasingly challenging for many reasons. Before starting this project, I believed heat would be my primary issue, especially since I am incorporating a Wallas Nordic DT heater and cooktop into the same box. However, the wiring layout, and more specifically the wiring attachment method, has proven to be my greatest challenge.
 

ramblinChet

Well-known member
I purchased the National Luna 80L refrigerator in 2019 and used it extensively during the first two years. Since late 2021, it has been running continuously without issues.

I chose this refrigerator primarily for its Danfoss BD35F compressor, manufactured in Denmark. This brushless, variable-speed, hermetically sealed compressor offers rapid cooling, low power consumption, and quiet operation. Secop, a German company, acquired Danfoss but continues to produce the compressor in Denmark. The Danfoss name remains well-regarded in the marine and RV industries, contributing to its widespread recognition.

To verify the refrigerator’s temperature accuracy after years of use, I tested it with my Fluke 87V MAX multimeter, equipped with a Type-K thermocouple (-40 to 260 °C). Over an hour, I periodically checked the readings, which consistently matched the refrigerator’s display within 0.5 °C, confirming its reliability. I plan to schedule preventive maintenance in the near future to ensure continued performance.
RC 25-217.jpg

I recently installed the final three feed-through connectors, completing the major electrical components and wiring inside the Zarges K470 case. This milestone is a significant relief, as it concludes the complex internal wiring. Moving forward, most wiring will occur outside the case, with only minor internal connections remaining, allowing greater flexibility in routing.
RC 25-218.jpg

Next, I drilled mounting holes to secure the case to the camper. The system, weighing approximately 75 pounds, is mounted above the roll axis and will endure off-road conditions. After calculations, I determined that four bolts would suffice but opted for six 3/8-inch bolts for added stability: two into the battery box below, two through the C-channel underneath, and two supported by cylindrical rubber bumpers for the floating floor.
RC 25-219.jpg

The image shows seven of the ten feed-through connectors extending from the K470 case into the battery box below. Two additional bolts visible at the rear are part of the mounting system described earlier. Five of these feed-throughs will connect to 1/0 AWG wire, completing the power distribution setup.

The inset image depicts a 3/8-inch drill bit breaking through the camper’s overhang above the bed rail, forming one of the mounting holes. My power sources are limited to 200 watts of temporary solar and a 125-volt AC outlet for tools like a drill or vacuum. As all work occurs inside the camper, space is constrained, and supplies are limited.
RC 25-220.jpg

A hardware store a few miles from my home has been invaluable. My routine involves waking up, eating breakfast, unpacking tools, and working until lunch. As the day heats up, I slow down, pack up, and secure the site. Afterward, I may drive to the store for supplies or visit the library for air-conditioned comfort. In the evening, I often walk at Yorktown Beach for an hour, return to set up camp, and occasionally perform minor tasks.
RC 25-221.jpg

I used ten wood screws, recently purchased, to secure five reinforced untreated bumpers around the K470 case’s perimeter. The mounting setup is complex due to the case’s design: the floating floor, with 0.5 inches of clearance, supports the heaviest components and wiring, requiring reinforcement. The side walls and perimeter hold additional components, including the Wallas Nordic DT and Victron Energy equipment. The mounting surfaces vary, with 45% of the case resting directly on the battery box, 34% 0.875" above a carpeted shelf, and 21% overhanging unsupported space. This requires supporting the floor and perimeter across three horizontal planes for off-road durability.
RC 25-222.jpg

To minimize shipping costs, I ordered additional supplies, including 2-inch screws for fans and a toggle switch, which will be installed soon. These components will complete the control panel setup.
RC 25-223.jpg

The project’s visible interface is taking shape, inspired by a cockpit design. Critical gauges are arranged across the top row, with secondary gauges and switches grouped below in a top-down, left-to-right layout. This afternoon, I plan to install the final four toggle switches and the Wallas Nordic DT control box, finalizing the control panel. Are you with me so far?
RC 25-224.jpg
 

ramblinChet

Well-known member
It was time to power up the Blue Sea Systems DC Accessory Panel to confirm everything functioned as expected. As previously noted, the DC voltmeter measures voltage at the 100A ST Blade fuse block, the tank meter monitors the diesel fuel level in my 30-gallon Titan auxiliary tank (which supplies my diesel heater and stove), and the temperature meter tracks the camper’s interior temperature. The two USB ports charge my phone, CR123 batteries for my Surefire flashlight, and other devices. The inset image shows the back of the accessory panel before wiring installation.
RC 25-225.jpg

I purchased three Ancor products for wiring the back of the accessory panel described above. The double male-female adapters allowed me to connect power and ground to the two center-mounted gauges, which use mini push-in terminal blocks. Initially, I considered 10 AWG wire to maximize connection capacity and bought the appropriate connectors. However, the setup became too congested, so I ordered 25 female disconnects for 16 AWG wire instead. Amazon Prime proved invaluable, delivering the parts the next morning without shipping costs.
RC 25-226.jpg

Originally, I planned to use the Victron Energy Smart BatteryProtect 12V 65A for another project, but after changing plans, it became available as a relay for the primary power wire to my Wallas Nordic DT diesel stove and heater. The Wallas draws 0.55–0.85 amps during operation but requires 8–10 amps for 5–10 minutes during ignition. The instructions recommend 10–6 AWG wire and states, “A main switch must be installed on the device’s positive (red) cord. Always disconnect power via the main switch after cooling is complete if the device will be unused for an extended period.” Since I had 8 AWG wire available, I used it for a one-foot run. The toggle switches I had were rated for 6 amps maximum, so I opted for the BatteryProtect instead of purchasing a 15-amp switch. This choice also allows me to monitor the Wallas’s energy consumption at various power settings via the Victron Connect app on my phone.
RC 25-227.jpg

I used Ancor 8 AWG 1/4" screw lugs for the Smart BatteryProtect mentioned above. The convenience of ordering precise components online, with next-day delivery and no shipping fees, greatly simplifies the process.
RC 25-228.jpg

By now, you may have noticed my enthusiasm for researching components and selecting the best options for my project - a habit developed during my career. For this phase, I needed a cable gland to safely pass multiple smaller wires without risking damage. While waterproofing to 300 feet isn’t necessary, the Sealcon gland I chose offers this capability, along with an operating temperature range of -40°F to 212°F and resistance to salt water, weak acids, weak alkalis, alcohol, esters, ketones, ether, gasoline, and more. I also ordered the Buna-N O-ring and locking nut to complete the setup.
RC 25-229.jpg

In an earlier order, I purchased a pack of five reinforced unthreaded-hole bumpers to support the suspended floor in my Zarges K470 case. I selected 1-1/4" high bumpers, ideal for two bolts securing the case, but two other bolts required 5/8" bumpers. Instead of ordering an additional pack, I trimmed two bumpers by threading a rod partway into each, securing it in a drill, and using an angle grinder’s cutting wheel to shape the rubber while spinning. This unconventional method worked perfectly for the two bumpers needed.
RC 25-230.jpg

Previously, I carefully laid out and drilled 24mm holes for the feed-through connectors, leaving 0.075" between each. When permanently installing the connectors, I needed a 0.075"-thick spacer to ensure uniform spacing. While this level of precision may seem minor, I value efficient, high-quality work that adheres to specifications. Spotting my drill set, I realized 5/64" bits (0.078" diameter) would work perfectly for the plastic components - and they did.
RC 25-231.jpg

With the Wallas control panel and final four toggle switches installed, my project’s front panel was complete. Comparing the finished product to the original design, I’m pleased with the outcome. Thorough planning, multiple iterations, and careful research led to a satisfactory result. My advice: don’t settle on your first idea. Take time, research, consult others, explore options, and refine your plan until you’re confident in the design.
RC 25-232.jpg

The Noctua fans and their controls are now permanently installed in a push-pull configuration. Based on my calculations, they should provide twice the required cooling volume in the worst-case scenario. As an experiment, I anticipate real-world results may vary slightly. I look forward to measuring and documenting performance over the next few years. The inset image shows a fan from the case’s exterior.
RC 25-233.jpg

As I test system components, I’m learning to synchronize settings to ensure consistent battery treatment across power sources. Aligning absorption voltage, float voltage, storage voltage, temperature compensation, and low-temperature cut-off optimizes battery health, enhances system efficiency, and simplifies management. This approach minimizes risks like overcharging, undercharging, or temperature-related damage, making it ideal for reliable, long-term battery performance in applications like full-time adventure and exploration. Ah, sometimes I grow so tired, but I know I've got one thing I've got to do...
RC 25-234.jpg
 

ramblinChet

Well-known member
Very cool stuff!

You know what you're doing, but I recommend putting the pull fan on the side by the wall and the exhaust fan on the end that doesn't sit close to anything that could obstruct flow.

Thank you for your recommendation @Dougnuts and if you have additional information to share I would love to hear it and learn more. My plans were to install the fans as you suggested but really for an unusual reason - when I am in the open desert I normally point the nose of my rig due south so the sides experience an equal amount of heat while the rear of my camper is always in the shade. The K470 case is 3.75" off the back and side wall but the back wall should be the coolest of all. We shall see!

Also, I selected this 120mm fans since it moves 102.1 m³/h of air, has a static pressure of 2.34 mm H₂O, and is exceptionally quiet. From what I have researched these values place the fan in the mid-to-high performance range and should work well for my application. Again, this is all an experiment so only time will tell but I plan to push this system to the limits, record the results, and share them with everyone.
 

Forum statistics

Threads
189,485
Messages
2,917,333
Members
232,376
Latest member
KurtActual

Members online

Top