I decided to tackle a few more things...
-Full e-brake rebuild, all of it, levers, pins, bolts, bushings, pads, disc, cable, ect ect.
-rearmost axle witches hat rebuild. The witches hat is the locker assembly. New bearing, seal, o-rings and springs for the hydraulic locker. New locker light...