So a rather long break from the forum with some rather large up and downs in the project which I wont go into at this stage (mainly related to budget and timeline). We have (finally) ordered the intermediate frame, toolboxes and GRP box which ill make anther post about as we made some changes to the specs of the foam and panels to be used. As well as some layout changes.
Progress thou is being made! Lots of mechanical work first as I opted for a pretty full on chassis tear down and full inspections and service. I am a little annoyed with myself for not undertaking this work myself. But until we have a property with workspace to finish the rest of the buildout that isn't a good option. Right now the cab and chassis is being stripped to get it ready for paint.
New wheel studs have been fitted as the old ones (below) are worn:
View attachment 710203
Quite a few smaller jobs in the engine bay, rocker cover gasket, new injector seals, coolant lines, air compressor belts, the oil cooling pipes for the gearbox need to be replaced, plug PTO, New fuel filter with water tap will be fitted, and then we have to replace the gasket on the rear diff cover.
View attachment 710198
Batteries relocated to inside the cab to free up toolbox space:
View attachment 710197
Also, there is a rust spot that needs to be welded:
View attachment 710199
Inside the cab we have ordered some new panels but some (below) we cannot find, we will look into other options to clean this up, big departure from original or modern look isn't what we are after, retro is the game.
View attachment 710200