Geo.Lander
Well-known member
RUB has arrived and assembly of the steps is underway at AV! The truck is still away at paint.
We are opting to have the subframe painted too even though it is already galvanised. The RUB bar has also been galvanised as it will be in the thick of the elements in during the winter. As soon as the truck arrives back I will be blasting the chassis and components with lano film too.
The RUB bar will be fitted alongside 2 custom tow hooks. there are actually 3 * 2" receivers on the bar:
AV starting to assemble the steps, I am really happy with the design they came up with in the end, there have been numerous design iterations and we feel the final version utilising IGUS flange bearings will make the whole unit serviceable, robust and smooth to operate.
We are opting to have the subframe painted too even though it is already galvanised. The RUB bar has also been galvanised as it will be in the thick of the elements in during the winter. As soon as the truck arrives back I will be blasting the chassis and components with lano film too.
The RUB bar will be fitted alongside 2 custom tow hooks. there are actually 3 * 2" receivers on the bar:
AV starting to assemble the steps, I am really happy with the design they came up with in the end, there have been numerous design iterations and we feel the final version utilising IGUS flange bearings will make the whole unit serviceable, robust and smooth to operate.