MrBeast
Explorer
So after going to all that trouble to swap tubs, I found a better tub than the tub I replaced the old tub with, so here we go again!
And it is the color I want! Paint looks like it will clean up enough to be serviceable!
Need to patch a bit of rust in the floor, but managed to score a patch panel from the same guy!
I say it was $300 (200 for the tub, 50 for the other parts, gave him an extra 50 for cutting out the patch panel for me) very well spent!
Hopefully will have it all cleaned up and welded up by Christmas!
Will get some better pics tomorrow.

And it is the color I want! Paint looks like it will clean up enough to be serviceable!
Need to patch a bit of rust in the floor, but managed to score a patch panel from the same guy!
I say it was $300 (200 for the tub, 50 for the other parts, gave him an extra 50 for cutting out the patch panel for me) very well spent!
Hopefully will have it all cleaned up and welded up by Christmas!
Will get some better pics tomorrow.