30
At this point in the renovation, progress is measured in getting the final details right...
(above) The existing speakers are mounted in frames with covers to fit the rear triangles... Before there were no covers on the smaller speakers and the larger ones had clear plastic covers... Very boat-ish... These will screw to the triangles on the walls... The metal grills are perforated metal painted with rustic bronze rattle can paint...
(above) The wall panel behind the fridge had 3" ventilation holes drilled into it.. Mesh insect screen is attached to the back side...Drawer guides are bolted to the panel...
(above) The shower sink base is ready to install...
(above) The folding bed panel is final fit with hinges, removed for sanding and the final layer of fiberglass...
(above) The kitchen sink countertop plywood base has four strong magnets built into it...
(above) With the magnets set, the sink and stainless countertop are glued together...
(above) A specific design request was for the coffee maker have a home on the countertop... To house the coffee maker, a chunk of walnut was plowed with a dado blade, then a hole saw cut went through another piece and finally the cut curves were glued to the straight piece...
(above) On the underside, magnets were countersunk and fiberglassed over...
(above) The walnut base goes over the magnets in the countertop...
(above) The coffee maker and some added weight were placed on the walnut pad to test holding strength.... In use there will be a flush wood cutting board under the walnut, so there will be no cantilevered weight, but I think without it, it would still be fine...
(above) Pivot there walnut base and it locks in place this way, with enough clearance from the faucet...
(above) Rotate it again and it's ready to use this way...
(above) After a water tank test and a pressurized water system test, the final shower wall panel is glued and braced in place...
(above) Horrible color from the LED work light, but you can see the walls and ceiling have the first coat of OSMO and the cabinet doors are fitted...
(above) The cabinet doors over the fridge installed... A small narrow shelf is over the door...
Getting close, but still a lot to do...