And the updates just keep flowin' in!
I was up at 5AM and decided to crank out some of the finishing details. Cut, stain and install the floor trim. If you haven't ever tried to miter trim corners with no miter saw or even a miter box just don't, it sucks...a lot. Also when I was test fitting the trim I noticed my final piece of flooring was about 1/2" short so I had to pull apart the floor and measure/cut a new piece. Re-paint the toe-kick for the main counter area. Re-cover the fridge door face with wall material. Install the 2" wide velcro I got to cover the gap where my plastic windows have shrunk. In doing this I noticed a lot of my roof lifting hardware was coming loose so I tightened that all up. Install the new matching curtain rods I got for all four windows, which required cutting two of them down for the tiny back windows. Its friggin hot out too, 92 with a heat index of 97, lots of humidity. Oh how I miss Colorado.
Its getting so close I can almost taste it!
Here you can see the white velcro I added to make up the difference where the clear plastic has shrunk. Along the top at the center you can see that 2" is only just enough to make it work. This stuff has really shrunk, I guess it is 33 years old!
Floor trim all 'trimmed' haha and ready for stain.
And stained. Minwax 'ebony' 2718 is my favorite! Same stuff I used on the vertical wood.
Taped off the floor and spray painted the toe-kick back to black.
Interior daylight shot of the rear door that I finished yesterday.
New ice box 'face' no pics during the process. It was fairly simple to remove the door, take out the laminate, recover and reinstall everything.
BAM! Curtain rods installed.
Also I have been working on the curtains. My mom started sewing them but took off and left me to finish. The big window is done, the other three windows are about halfway done. I installed the big window curtain and Im not sure if the color is really what I want. I'm going to finish sewing the other windows and put them all in there before I make up my mind. Its a lot of work to do if Im unsure but I don't really have another choice. You guys don't get to see until they're done though!