Mark Harley
Expedition Leader
I had some time and daylight after work to finish the receiver mounts that will hold my cooking table.
the holes drilled well with a new set of Craftsman bits. I mounted the 1/8" plate to three crossmembers under the trailer tub.
Two holes were open and I used lock nuts with the bolts the other four were blind and needed to be tapped.
The steel of the M101A2 trailers is thick and taps nice.
all six bolts snugged down tight and may be over kill but I want this to last.
I stated before that I won a nine foot offset post umbrella, I am going to make a receiver mount to slide it into and be able to use it with the trailer.
It will be removable from the receiver tube and store in the trailer simular to a flag pole mount.
Here is todays progress:
the holes drilled well with a new set of Craftsman bits. I mounted the 1/8" plate to three crossmembers under the trailer tub.
Two holes were open and I used lock nuts with the bolts the other four were blind and needed to be tapped.
The steel of the M101A2 trailers is thick and taps nice.
all six bolts snugged down tight and may be over kill but I want this to last.
I stated before that I won a nine foot offset post umbrella, I am going to make a receiver mount to slide it into and be able to use it with the trailer.
It will be removable from the receiver tube and store in the trailer simular to a flag pole mount.
Here is todays progress:
Attachments
Last edited: