jaleel_da_sheik
Observer
Lowly (shop) Update:
Progress continued quite steadily thru the summer and now that Autumn is upon us we have been racing the weather to get the shop sealed up.
All roof and wall sheeting is now installed with just a bit more trim work to complete.

The side doors will open into shipping container sized storage areas while the large center door will be the main workshop.
A 28 foot long glue-laminated beam will span across the back of the shop for storage above and post-free workbench space below. The janky scissor lift once again came in handy to do the heavy lifting.

Door installation and interior framing will hopefully be completed by week's end. Lowly's winter hibernation location is getting closer to completion!
- Sheik
Progress continued quite steadily thru the summer and now that Autumn is upon us we have been racing the weather to get the shop sealed up.
All roof and wall sheeting is now installed with just a bit more trim work to complete.

The side doors will open into shipping container sized storage areas while the large center door will be the main workshop.
A 28 foot long glue-laminated beam will span across the back of the shop for storage above and post-free workbench space below. The janky scissor lift once again came in handy to do the heavy lifting.

Door installation and interior framing will hopefully be completed by week's end. Lowly's winter hibernation location is getting closer to completion!
- Sheik
Last edited: