matthewp
Combat Truck Monkey
The last couple days involved work on the control box and the dividing wall between the kitchen and sleeping area. This wall involves a 2" gap for water and electrical lines. Here is a top view:
From the sleeping bay side, there will be a removable panel:
The kitchen side is open behind the area that will be behind the drawers:
The concept of this will to be to maximize the access area in the void.
From the sleeping bay side, there will be a removable panel:
The kitchen side is open behind the area that will be behind the drawers:
The concept of this will to be to maximize the access area in the void.