Trophycummins
Adventurer
The beauty of working a shop that does audio installs, theres always spares lying around.
Took an inventory of items I got for the 2 house batteries:
Lighted rocker switch - To control the solenoid position
2x 80amp PAC solenoid - to run them in parallel
4GA power cable
2x 150amp circuit breakers for the feed line
2x 1 year old PC1200's
For the low low price of $40.
Working on a battery box in solidworks now.
Tent came in today too. Went with a smittybilt because of the excellent deal I got on it, I couldn't pass on it for the deal I received.
Took an inventory of items I got for the 2 house batteries:
Lighted rocker switch - To control the solenoid position
2x 80amp PAC solenoid - to run them in parallel
4GA power cable
2x 150amp circuit breakers for the feed line
2x 1 year old PC1200's
For the low low price of $40.
Working on a battery box in solidworks now.
Tent came in today too. Went with a smittybilt because of the excellent deal I got on it, I couldn't pass on it for the deal I received.
![cecf0a987e444e6a76748615d1b514d7.jpg](http://uploads.tapatalk-cdn.com/20160726/cecf0a987e444e6a76748615d1b514d7.jpg)
Last edited: