On my to do list:
1. Rear tire carrier and tool rack off the back bumper
2. Rear winch mount (done) and install winch
3. Front winch mount
4. Add two more fuel tanks for 90 gallons total
5. Install 700R4 with ORD Magnum Box and new ORD NP205
6. Banks Sidewinder Turbo
7. Install Nostalgic Air A/C
8. Insulate rear cabin
9. Build custom cabinets in rear cabin. (add mattress)
10. Install Freeze Fridge and stove.
11. Install water tank and shower Kit.
12. Install comms and solar panels
13. Rock sliders/step
Tear it all apart and repaint, insulate, sound deadening, new interior, new windows and all new light covers ect ect. Then put it all back together.