Yesterday was productive.....
I made most of the hard lines for the chassis. I still need to find a misc fitting or two but they are all in place and routed. I decided to do the chassis hard lines in steel AN-3 fittings. With all the transitions I had to make from metric or NPT in the chassis I thought it would just be easier....
I used 1983 Honda Accord front brake lines for the soft lines at all 4 corners. Fr $10 a line they work great with the Geo Tracker/Suzuki Sidekick calipers. The same brake line works at all 4 corners now. If you haven't guessed yet, I like it when parts are common and can be used in multiple locations. Finding some AN-3 to 10mm-1.0 metric male adapters was a little hard, but Speedway has them for $10 a pair.
I will be adding a few soft replacement an-3 lines as hard line emergency replacements in the trail kit along with a spare soft line.
After the brake lines where done it was time to put the powertrain back in the chassis.....
I need to add the torque mount to the transmission crossmember along with a few threaded inserts for the future mini belly skidplate. Then its time to tackle the exhaust. I have broken stud in the passenger side exhaust manifold outlet flange. I have been giving it doses of PB-blaster for a few days. I hope it comes out.....
Anyone got any exhaust building tips and tricks? The passenger side is going to be fairly complicated......over the front driveshaft and down under the front of the transmission behind the bellhousing. That almost sounds like a kids book......not really......