28 May 2016
I have an assistant this weekend. We are on time for the 190K drive to IPOH so I stop 40K up for DONUGHTS 40 minutes to go the lasst 45K to the workshop EASY.
**** buying the doughnuts takes forever then on exit from the roadstop TRAFFIC JAM. WAZE states accident 570 metres away 30 minutes wait. NO NO NO NO !
So here is the reason I was 30 minutes late to the workshop. Takes a LOT of skill to hit the bridge and only put both front wheels over the edge. Stupid prick was out with the insense and on his knees praying frantically and rocking back and forth as we crawl by at 9.00am.
So first items trip to the Hydraulic shop for last minute stuff and the 12v battery is purchased. Back to workshop damn its lunchtime so lunch first.
Joy works on the doors sand first and we fill the separation tubes full of WD40 so we can attempt door splitting later today.
Someone sends me pics HEY your on TV with the fishing video
So here it is
[URL="http://www.geckoadventure.net/Images30/5_Tourism_Malaysia_Angling_Paradise.wmv[/URL]
Stupid PLUG for the Injector pump.
We fill the tank with DIESEL. NO NO NO everyone forgot the bottom BUNG which is impossible to see is missing, 10 litres of diesel runs all over the floor and $50rm of KITTY litter needed to soak it up. Another item to get from the hydraulic shop next saturday.
29 May 2016
We work on the doors by 10.15 we have one door split. Its a lot of work. A Bar the right size to slip up inside the tube gentle tapping to push the inside tube up and we have to cut one tube out to get to the inside tube and lots of WD40.
Then I decide I need to cut the panel open to see how much rust is inside the panel. Sure enough my guess is correct. I will make a cover panel up later to replace the cut out panel. Anyone else with a VOlvo should look at doing this also. Rust converter and undercoat etc will be needed on rebuild to prevent a reocccurance.
The cutout panel hmmmmmmm perfect.
We go to lunch and cannot find the puppy to lock him out so leave him in the Factory. Bad move. Return to a bag of 500 cable ties all over the floor. New VOlvo Fan dragged on the floor. My tool box sponge ripped up on the floor. Damn a mess to cleanup.
The rust is revealed the rubber strip between the 2 door halves keeps moisture causing a lot of rust.
And more rust.
The naughty puppy.
The wiring of the fuel tank is completed as is the hose connecctions all ready to go with some minor wire protection needed to be installed next weekend.
Then time to connect the front 12v battery up
Then back to the final door and we have to cut the panel out to enable splitting of the door.
Wow it works the second door is soon apart and I give the bare metal a quite galvanise underccoat to protect it. However I had to also cut the outside tube out to accomplish the door split.
Then we worked on laying the 2 sets of winch cables from the rear winches to the batteries. Winch controller (Albrights) will be connected next weekend.
The intercooler is finally now connected - only the fan is left to connect next weekend.
Due next week. Centre top console. Speaker panels. Brackets for the intercooler and air cond condensor. Panels for the service hatch doors. The test panel looks awesome.
Injector Pump plug
Reconnect the repaired radiator.
Test startup
replace the engine water with coolant
Bolt the fuel tank down
4 hours home in the traffic it was a CRAP drive.
And the heart well Monday was checkup day all perfect again heart was happily sitting on 65BPM and regular again.