12 November 2016
First some pics of my boat holiday
A lone Elephant. My friends first time seeing a wild elephant he was stoked
A remote camp site early in the morning
Kayaking in the same cove
Saturday
Depart KL 6.30am its a cold 26c im shivering lol just floor it and sit on 150k arrive IPOH 8am im time to have a nice breakfast.
Arrive workshop 9am and everyone (hey wait a minute) is present working on the Volvo wow 4 people working on it. Battery box being changed to accommodate the 4 batteries in a line. 2 150 AMp and 2 DEEP CYCLE 150 amps for the 12V. Wiring is getting plugs attached.
First job join the 2 parts of the cabin together. Find the bolts damn 4 3/8th bolts missing we search the
shop and find 0. Why does Volvo mix imperial and metric bolts on the same part? I go to the bolt shop and get what we need and get 2 thread types to be sure. 1 hour later return - DAMN! they don't fit. Brett finds 3 and we are missing one. Finally we apply the glue and the sealant and lower the top to the base. Bolt it down. Yahoo done.
Lunchtime workers go home and then we start on getting everything under the floor ready so we can bolt down the floor.
First the lockers I have the wrong solenoids from ARB. Crap down to the hydraulic shop for new ones. Since I have to be back in KL to give a 6pm charity event I go to the hydraulic sop then head forr home however 1 hour in the hydraulix shop leaves me frusrated 2 sets pleas come out with etc . 50 feet of soft hose comes back with 6mm joints fark!!!!!!!!. Homeward bound yes of course it raains heavily turning the road to a ice skating rink. Arrive at the presentation 5 mins late give the presentation and I get participants joining up. Now I have 10 kids from the home to teach how to kayak and paddle for 8+ hours per day for 8 days.
13 November 016
Sunday
Up early no im not 1am I take cough medicine and its the sleepy one by mistake. 7.31am wake up fark!!!!! Floor the car even harder poor little Isuzu doesn't see the slow side of 160k much, arrive IPOH 9.08am.
First job run through the mods to the boat trailer.
Reinforced no longer the massive flex it had. he general view was it would have folded in half or snapped soon if it was not noticed. Discussion on batteries and fridge and hammock racks conttinues.
Then its onto the Volvo
I have the wrong solenoids after all that effort yesterday sigh!
Sweep up everything around the Volvo takes me an hour to cleanup.
Discussion on the 12V and wiring changes and the 12v battery management takes another hour by then its lunchtime.
So the afternoon is spent finishing the compressor take installation. Paint trim paint fit test fit fit ec. Then it's done just one little paint touch up to go later. It's not perfect but its practical and removeable.
Battery boxes realigned and more cable brackets have been installed. The 12v electric cart battery's are huge.
The 12v battery monitor is to be obtained next week
The cabin joined. Now I need to paint it again.
Since i'm at a cleanpoint I decide its home time I will go work on Volvo 2.
Next weeks tasks:
Lockers finish install
T-Max winch finish cables
Start clutch slave cylinder install
Finish PTO and 4x4 Vaccum and breather hose installation
Finish rear panel install and window install
Hell drive home pouring rain - I just cruise Bruce Springsteen then Blondie on the stereo
8pm i'm sitting in a little restaurant 500 metres from the KL workshop watching a motor bike accident happen
9pm i'm in the workshop working on Volvo 2.