Progress so far....
  
    
    
     -New Crate H55F Speed Tranny              In, ready for install
     -Rebuilt Transfer case from donor 60        In, ready for install
     -New Aisin Hub Retrofit                          In, ready for install
     -New Window Rubber                            In, ready for install
     -New Door Rubber                                In, ready for install
     -Bucket Seats, likely Bestop                   Drivers side in and ready for install, waiting 
                                                              on passenger seat
     -Full Length Roof rack
     -Tuffy Center Console                           On order 
     -Valve Adjustment and General Freshening of the 2F Motor
     -3.70 Gears from a Donor 60                   No Longer being done as gears are 4.11 and      
                                                              not 4.88 like we originally thought
  
     -New'ish Steel Wheels                           Ordered two weeks ago, should be here this 
                                                              week
     -New Shoes, probably 33x9.5 BGF AT's     295.75R16 BFG AT's are in and 
                                                              waiting for wheels
     -OME Heavy Suspension and shackles       OME Medium suspension and 2" over  FourPlus
                                                              shackles are in and ready for install
     -Bull Bar of some sort                             FourPlus bull bar should be here next week
     -Winch of some sort                              used 9k Superwinch sourced, waiting for PO to 
                                                              remove from vehicle
     -General wire wheeling of interior surface rust and POR-15'ing
     -Carpet Kit                                           In, ready for install
     -Heavy Rubber Bed Mat
    
       The project is coming together nicely, we have a massive pile of parts ready for installation. Most everything listed will be finished/installed in the next 3-4 weeks.
     Now we just need a title from the State of Colorado...