Well it has been a while since I posted, and I owe you all an update on the progress!
Things have been moving along at a pretty solid clip here! First let's talk about the truck.
We painted all the associated running gear parts installed the axles and added an air locker to the front.
View attachment 684464
View attachment 684463
We put in all new u-joint, seals, etc, going with Spicer parts where possible.
View attachment 684469
We took out the transmission and fully inspected the clutch (expecting to replace it) but it was already pretty new and in great shape, so we put it all back together. Do not believe the shop manual when it says this is a 4 hour job, it is longer...
View attachment 684466
View attachment 684467
We stripped down the entire dash and associated plastic parts with steel wooled it and painted it with Color Bond LVP Refinisher. I think they turned out great! I was pretty terrified to paint it, but there were too many places that just didn't look great. The pain makes nice even coats and dries pretty quickly. I didn't get many in progress photos of this for some reason.
View attachment 684470
We cut the new carpet to fit and installed it
View attachment 684472
View attachment 684471
Then we steam cleaned the seats and bought a new middle seat from the junkyard (still not installed yet)
View attachment 684473
And intstalled a new fuel tank from Titan as the old tank was showing some delamination issues:
View attachment 684474