Another month goes by!
The truck has been back on the road for the first proper run since it was sliced in half. Seemed to drive nicely enough, although some heavy vibrations at one specific speed. I suspect that's due to being completely unloaded. Will keep an eye on that.
I took it to sandblast the subframe, that was an unpleasant few hours. For anyone that's seen the process, you'll understand. Suited up with positive air pressure helmet. Loud, dusty, half blind. And I did a pallet of other bits and bobs at the same time.
Then I left it behind and it was all powder coated with two coats of zinc infused powder. A week later I was back to re attach and collect the parts.
I also had a friend weld up the grey water tank. It's the original fuel tank and is stainless steel. I cut it shorter and added some bungs. Should do just fine for grey water. I guess we'll see.
I also weighed the truck on the way to unload the subframe. 3500kg on the front axle, 2300kg on the rear. That's with subframe, one fuel tank half filled. Leaving me about 4000kg to my estimated final weight. But I've got 6000kg till gvw. Would like to keep it as light as I can of course.
Speaking of weight, I need to figure out what type of material to build cabinets with. Any suggestions?
Few more bits to bolt back onto the frame then it's time to start assembling the panels! Finally.