930am to 3am yesterday working on the truck!
Just got the bolts I needed to mount up my fridge and fridge slide, my fishing rod holder and my Roadshower. Made a mounting bracket for the Roadshower yesterday, ready to bolt it on now. Got my propane tank mount done and on the roof rack as well. Jerry can carrier and ladder are mounted up and done. So is my Front Runner BBQ, that has been sitting in a box since I got home from Baja 2yrs ago!
All I got today besides what I already mentioned is fit the front skid plates, top off my front diff, install some cotter pins in my front end, fit my din cubby bay and install the master switch I just got today from UAE.
I think the truck is then done until I get out of here. In Boise I am installing hammock holders to the bumpers. In Oregon I am getting a new windshield installed and then a load of stuff to do at Valley Hybrids and this truck is a done deal.
Next two days will be finishing up loose ends and I am off!
Cheers