Two long weeks.
A major storm tried to wipe out parts of our little town of Griffin, 4 Tornadoes, EF3's, LOTS of damage but thank God no deaths in Griffin. It could have been SO MUCH worse. We took a break from the build for a few days to help out. The storm front also crushed parts of AL.
Something this guy NEVER likes to see on his storm app! About 45 min before we got hit. See the little hook just west of us, the blue circle....BAD!
View attachment 762630
OK....now on to the good news
Table mounted, heater installed and almost fully hooked up, I had the wrong size heat sleeve. Kitchen drawers done and the cabinet is finished, minus a shelf and the bamboo fronts and doors.
View attachment 762632
Table mount. There are 1.25" X 3" X .125 joiner plates on each upright top and bottom behind the 8020 mount you see to tie everything together. My wife says always overbuilt, but my stuff almost never breaks
View attachment 762631
This thing is a beast! I put it together and shook the heck out of it and it is a stable table
View attachment 762633
It is winter...so we might need a heater soon.
View attachment 762634
The Expedition Upfitters flange was money well spent! A little sealant and done!
View attachment 762635
A few builders on EP gave a pro tip.....assemble it BEFORE you install on the floor. Pro tip taken!
View attachment 762636
More drawers! The kitchen cabinet in DIY form. So easy now! They come out square and strong.
View attachment 762637
My wife will epoxy the counter top in the next week or two. A few plumbing things to change, to make some more room under the sink, and switches to final wire and we have a kitchen!
Bamboo time.....SOON!
View attachment 762638
ONWARD!!
CHEERS!!