Some more work done today setting up the sheet for the wells. I started with forming the top of the well and bent over the edge on the down side. I figured it would be a better seal that way.
Well got some more work done today. Made a handle for the lid to lift up, did a like rust inhibitor paint and some color sanding. Added para cord for the drop down doors. And sealed the box with PL premium.
She is getting there just got to order the raptor liner for the paint. I have had good luck with that before on my trucks beds.
Some more work today. Sheeted the back of the trailer today not all done tacking it in place but close. Didn't have one whole piece that size so I had to make due.
Now I need to work on figuring out how to lock the doors for security.
Finish tacking the back along with adding mini handle and two toggle latches. Now I need to fashion a lock. For all doors and opening parts. I have some ideas pictures to come.
I added some flooring on the inside today of the trailer. It was the square plastic tool shop interlocking stuff. Had to do some cutting but it looks nice. Also decided to prime the beast myself.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.