pods8 will you be at the Overland Rally in Ellensburg? Would love to see your work. This is outstanding work!
Wondered how you were getting on Pods.
Really looking good. So how many pieces are you breaking it down to before you start glassing it?
I'm breaking it down to all flat pieces so I can do the glass work with them lying flat, I'm thinking the extra effort to then reassemble them will be offset by the easier time working in the horizontal plane. 8 pieces: Floor, Driver side wall (including cabover rail), front wall, back wall, front cabover short wall, cabover floor, rear portion of passenger wall, front portion of cabover wall (including cabover rail).
Won't your clearances for putting back together all be off after you've applied glass? Thought glass would be binding it all together.
I'll have to cut cloth "tape" strips to apply a ply schedule across each joint...
...Then the cloths "tape" strips will be wet out on plastic sheeting on the work bench and carried over and worked into place.
Now I'm not getting any line spacing!!! What's going on!!!