new toolbox and dual 12 volt system
took me a long time to get all this together and planned out, but definitely worth it.
new toolbox the day I got it!
collecting components took awhile...
ripped the old junk out of the truck and started laying out the interior of the new box:
sub-structure brackets all complete and painted:
test fitting the dividing wall and shelf:
drilling more holes.. pressure switch bracket completed
making a pattern for the underhood bracket plate to hold the BlueSea fuse block (thanks barlowrs!)..
test fitting the bracket plate under the hood. made this out of 16ga
laying out the shelf components, IBS relay and fuse holder (also started installing some stickers lol)
center console disassembled, running all the wiring for the battery controller module:
All remaining metal parts getting paint:
Installing the battery controller module in the center console. Made this little bracket with velcro to hold it place, worked great!
battery controller in place:
re-wiring all the old accessories to the new fuse block location:
finally time to mount the box into the bed, all brackets bolted in first..
giant wire snake creature routed up into the bed..
box mounted to bed and ready for components!
cont. in next post..