ebrabaek
Adventurer
Second season prep/modding of the Smitty have begun.
First is welding a bracket on the the rear swing tire carrier. It will hold two 2 gallons rotopax fuel cannisters. As the front tongue area will soon be fully enclosed in a Carbon Fiber box, I was not real keen on storing fuel in an en closed area and also wanted to shift as much weight rearward as possible. Cost..... about $10 for the 1x3 inch iron piece.
![20181214_102427.jpg 20181214_102427.jpg](https://expeditionportal.com/forum/data/attachments/391/391695-ac17f7b8f8f744745d54ccfb4c8c34d6.jpg)
![20181214_110359.jpg 20181214_110359.jpg](https://expeditionportal.com/forum/data/attachments/391/391696-9044e8a8c2a77f920cc4b98d3e43d25d.jpg)
![20181214_113032.jpg 20181214_113032.jpg](https://expeditionportal.com/forum/data/attachments/391/391697-bb9e47f6164403ea8b020a5f9fe8abda.jpg)
First is welding a bracket on the the rear swing tire carrier. It will hold two 2 gallons rotopax fuel cannisters. As the front tongue area will soon be fully enclosed in a Carbon Fiber box, I was not real keen on storing fuel in an en closed area and also wanted to shift as much weight rearward as possible. Cost..... about $10 for the 1x3 inch iron piece.
![20181214_102427.jpg 20181214_102427.jpg](https://expeditionportal.com/forum/data/attachments/391/391695-ac17f7b8f8f744745d54ccfb4c8c34d6.jpg)
![20181214_110359.jpg 20181214_110359.jpg](https://expeditionportal.com/forum/data/attachments/391/391696-9044e8a8c2a77f920cc4b98d3e43d25d.jpg)
![20181214_113032.jpg 20181214_113032.jpg](https://expeditionportal.com/forum/data/attachments/391/391697-bb9e47f6164403ea8b020a5f9fe8abda.jpg)
Last edited: