ebrabaek
Adventurer
Second season prep/modding of the Smitty have begun.
First is welding a bracket on the the rear swing tire carrier. It will hold two 2 gallons rotopax fuel cannisters. As the front tongue area will soon be fully enclosed in a Carbon Fiber box, I was not real keen on storing fuel in an en closed area and also wanted to shift as much weight rearward as possible. Cost..... about $10 for the 1x3 inch iron piece.
First is welding a bracket on the the rear swing tire carrier. It will hold two 2 gallons rotopax fuel cannisters. As the front tongue area will soon be fully enclosed in a Carbon Fiber box, I was not real keen on storing fuel in an en closed area and also wanted to shift as much weight rearward as possible. Cost..... about $10 for the 1x3 inch iron piece.
Last edited: