Day Two
Hit a tiny snag... whent to drill the 25mm hole in the fire wall to run some conduit through and realised the drill didn't fit in the space.. I am going to need a hand from my mate but that will have to wait until tommrow...
Anyway I carried on with other bits and bobs
Riveted the relay brackets to my fabricated bracket
Then I started tidying up the wiring for the reversing lights that I throw in at the time
I also found a pretty neat use for my camera equipment... A coiled cable holder! Haha
I also added abit of conduit to any pinch or heat points to protect the wiring
I am starting to run out of things to do until I drill the hole through the conduit...