# 21

(above) Before opening the shop door, another row of blocks went on the tabletop...

(above) Yellow glue and 22 gauge pins...

Time to put the water tank together...Everything was washed with soap, the slip connections were dry sanded with 60 grit for a good epoxy bond and the outside of the tubes was wet sanded to 220 grit..Again it all got washed...

(above) The faucet fittings: PVC cap with a hole in it...The through fitting is a connector with the slip fit portion cut and a 1/2" pipe nipple goes between...Simple...

(above) Epoxy glues the parts together...Same as I did mine in '06...I set the tank aside for at least a day before I'll wet sand the outside one more time, then install it...

(above) Next the countertop edging was cut from a 2x4, a rabbet was cut into the edge, miters were cut, the corners are glued, taped,then pinned...
(above) Clear Polyseam works well between the wood and stainless...

(above) On the driver side the tape is pulled...Ready to putty the holes and lightly sand...

(above) Curb side...Let it all dry overnight...

(above) Tomorrow it will get final sanded then sealed...