You would think that in the last two months I would have something significant to report, but not really,bogged down with trim. Plus I have spent too much time screwing off
I have the remaining two dozen pieces of aluminum getting powder coated this week. Most of it is for the doors, I'll post pics when I get it installed, should be done Thursday.
Had to roll the camper out to rearrange the shop and get some new (old) cabinets in. I figured I would pop the top and take some pics. First time it's been outside I was a bit irritated that I had to roll it back in.
Wow, great job with your restoration, that looks better than new! I've been looking around for a restoration candidate for awhile now, but finding Alaskans on the east coast is like hen's teeth. I look forward to seeing more updates!
Wow, I have not updated in a while. I have the cabinet frames, countertop with Smev stove and sink all in, along with the furnace. Put in some bamboo flooring on the floor and battery and water compartments. It's all water tight, just need to get back on normal work hours and get it outside. I
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.