February progress report
I've been lazy on the update sorry about that.
Lately I've been sorting out the wiring and the accessories for comfort. I reached the stage where I need to get the floor done and start running wires. I finished the under floor storage, no pics I'll add some later but here are some pics of the low voltage wiring and switch panels I'm having made.
2 100 amp fuses for house batteries
Low voltage distribution box
A lot of times you need to make little jumpers on the relays, I used welding rod and it makes for less wires and cleaner look
welding rod clipped
Here's a shot of the billet grill, some stainless bolts and the ujor frame support make for a very aggressive look.
Dual shocks were in order, so while I was there I raised the top shock mount hole 1 1/4" to gain more bump travel, spacers to go between and some 6" bolts and now it's riding really nice
I also mounted 5 rock lights under the van, here's the front bucket lights, I used 55w Hella flood lamps, because their cheap and I won't care if they get damaged. $30 for all lights.
License plate to match
Switch panels on the operating table
The Master Machinist Dave aka Snoopy
Rear door switch
Galley switch panel on the table
Two down 1 to go, THANKS DAVE !!!!!!!!