I am following the Fuso body builder guide to the tee. The little brackets hanging from the u bolts are to be welded onto the spacers. I had custom U-bolts made. Those and the oak for the cushion between the frame and subframe were two items which were significantly more expensive than expected!!
Top up! Electrical and hydraulic systems functional. It's a good thing too with my scheduled departure in three days. Remaining items to do: on board air, running and tailight assemblies, mudflaps, underbed tool box, rear bumpers(2), and spare tire mount.
New LED running lights installed, rear upper bumper painted. Test fit of spare tire in preparation for rear lower bumper construction. First look at rear departure angles. Acceptable.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.